Remaining infrastructure works and buildings, trackwork, E/M installations, signalling, telecommunications and electrification of the new double-track RL Tithorea – Domokos
Design and Technical Consultant Services during project construction. The project includes design of embankments’foundation on soft soils and geotechnical behavior, foundation solutions for long steel, railway bridge SG26, corrosion protection of embankments and cutting slopes, reinforcement of railway subgrade, cuts’ stabilization, temporary retaining structrures for the construction of railway station and bridge, monitoring programs end evaluation of monitoring measurements.
October 2014 - March 2016
ERGOSE S.A. (Railway infrastructure projects)
J/V TITHOREA-DOMOKOS (AKTOR, J&P AVAX, TERNA)
J/V TITHOREA-DOMOKOS (AKTOR, J&P AVAX, TERNA)