Museum of Contemporary Art of Goulandris Foundation, Athens
Μonitor the construction of the retaining structure of UPN profile piles with prestressed anchors to support excavation cuts, underneath of an early 20th century listed building, adjacent buildings and structures and existing building walls. Excavation depth down to 30,0m from ground surface in Athenian Schist. Monitor behavior of retaining structure by evaluating the measurements of numerous benchmarks, inclinometers, load cells.
October 2014 - May 2015
GOULANDRIS FOUNDATION
FRANK E. BASIL Construction Management
Sotiropoulos& Associates SA