Design of TBM Tunnel, Water Transfer Tunnel from Oropedio Lasithi, Aposelemis Dam Reservoir Enhancement Works, Water Intake Reservoir
Geotechnical Evaluation, TBM Tunnel Design for circular shaped tunnel section, Entrance – Exit Portals Design, for the Water Transfer Tunnel of ≈3425m length and also Earthworks Design of the Water Intake Reservoir (stability, settlement and slope protection), Geotechnical Foundation Design of the Water Entrance Structure of the water intake reservoir and Excavation & Foundation Design of the Water Intake Tower, for the various the construction stages.
October 2014 - December 2015
Organization for the Development of Crete S.A.
Intrakat S.A.
Sotiropoulos& Associates SA